AlChaer, E and Issa, C A (2020) Engineering Productivity Measurement: A Novel Approach. Journal of Construction Engineering and Management, 146(08).

Cai, S, Ma, Z, Skibniewski, M J, Bao, S and Wang, H (2020) Construction Automation and Robotics for High-Rise Buildings: Development Priorities and Key Challenges. Journal of Construction Engineering and Management, 146(08).

  • Type: Journal Article
  • Keywords: Construction automation and robotics; High-rise building construction; Robotics research and development (R&D);
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001891
  • Abstract:
    Construction automation and robotics have been researched and developed over the last three decades. Although the practical needs keep rising, the on-site application rate remains limited. Therefore, this study aims to explore the right approach to the future development of robotics for construction and maintenance of high-rise buildings in China and the US by identifying development priorities (DPs) and key challenges (KCs) related to this technology application domain based on the perspectives of both experienced users and prominent experts. Questionnaire surveys were conducted among major construction companies in both countries to compile data on the current state of related practices, needs, and factors affecting the users in implementing construction automation and robotics for high-rise buildings. The survey results of the two countries were analyzed and compared to provide initial information for a subsequent international expert workshop. Thirteen experts in construction robotics research and development (R&D) were in attendance at the workshop in Beijing in November 2018 to discuss DPs and related KCs. Six major DPs and related KCs were identified, and their implications for future development were described. This study identified the top DPs and KCs and also proposed an effective approach for identification by considering both the practical needs and technical and economic feasibility. It is expected not only to be a valuable reference for many countries and regions where high-rise buildings are being developed but also to contribute to the knowledge body of automation and robotics for high-rise buildings.

Chen, Y, Chen, S, Hu, C, Jin, L and Zheng, X (2020) Novel Probabilistic Cost Estimation Model Integrating Risk Allocation and Claim in Hydropower Project. Journal of Construction Engineering and Management, 146(08).

Han, Y, Yin, Z, Zhang, J, Jin, R and Yang, T (2020) Eye-Tracking Experimental Study Investigating the Influence Factors of Construction Safety Hazard Recognition. Journal of Construction Engineering and Management, 146(08).

Ibrahim, M W, Hanna, A S, Russell, J S, Abotaleb, I S and El-adaway, I H (2020) Quantitative Analysis of the Impacts of Out-of-Sequence Work on Project Performance. Journal of Construction Engineering and Management, 146(08).

Jiang, Y and Bai, Y (2020) Estimation of Construction Site Elevations Using Drone-Based Orthoimagery and Deep Learning. Journal of Construction Engineering and Management, 146(08).

Kim, J J, Miller, J A and Kim, S (2020) Cost Impacts of Change Orders due to Unforeseen Existing Conditions in Building Renovation Projects. Journal of Construction Engineering and Management, 146(08).

Li, H, Lv, L, Zuo, J, Su, L, Wang, L and Yuan, C (2020) Dynamic Reputation Incentive Mechanism for Urban Water Environment Treatment PPP Projects. Journal of Construction Engineering and Management, 146(08).

Li, J, Wang, H, Xie, Y and Zeng, W (2020) Human Error Identification and Analysis for Shield Machine Operation Using an Adapted TRACEr Method. Journal of Construction Engineering and Management, 146(08).

Ryu, J, Alwasel, A, Haas, C T and Abdel-Rahman, E (2020) Analysis of Relationships between Body Load and Training, Work Methods, and Work Rate: Overcoming the Novice Mason’s Risk Hump. Journal of Construction Engineering and Management, 146(08).

Sonmez, R, Aminbakhsh, S and Atan, T (2020) Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem. Journal of Construction Engineering and Management, 146(08).

Tan, T, Lu, W, Tan, G, Xue, F, Chen, K, Xu, J, Wang, J and Gao, S (2020) Construction-Oriented Design for Manufacture and Assembly Guidelines. Journal of Construction Engineering and Management, 146(08).

Yin, X, Chen, Y, Bouferguene, A, Zaman, H, Al-Hussein, M and Russell, R (2020) Data-Driven Framework for Modeling Productivity of Closed-Circuit Television Recording Process for Sewer Pipes. Journal of Construction Engineering and Management, 146(08).

Zhan, W and Pan, W (2020) Formulating Systemic Construction Productivity Enhancement Strategies. Journal of Construction Engineering and Management, 146(08).

Zhang, R P, Lingard, H and Oswald, D (2020) Impact of Supervisory Safety Communication on Safety Climate and Behavior in Construction Workgroups. Journal of Construction Engineering and Management, 146(08).

Zheng, J, Wen, Q and Qiang, M (2020) Understanding Demand for Project Manager Competences in the Construction Industry: Data Mining Approach. Journal of Construction Engineering and Management, 146(08).

Zhu, L, Cheung, S O, Gao, X, Li, Q and Liu, G (2020) Success DNA of a Record-Breaking Megaproject. Journal of Construction Engineering and Management, 146(08).